-
22
Eastbound from Country Club Rd. to I-287 (4.4 mi.):04 -
22
Eastbound from N. Gaston Ave. to US 1&9 (25.1 mi.):34 -
22
Eastbound from North Dr. to GSP (10.0 mi.):14 -
22
Westbound from Glenside Ave. to I-287 (12.1 mi.):16 -
22
Westbound from NJ 28 to CR 523 (6.5 mi.):08 -
22
Westbound N. Gaston Ave. to CR 523 (10.3 mi.):12
NorthCentralSouth
-
As of 6:58am, there's a Disabled vehicle on the George Washington Bridge lower level westbound New Jersey Side in Fort Lee. 1 Right lane blocked.
-
As of 6:56am, there's a Traffic Signal Down on NJ 38 in both directions in the vicinity of CR 607/Church Rd in Moorestown Twp. All lanes open westbound; right shoulder closed eastbound.
-
As of 7:03am, there are Delays at the Holland Tunnel south tunnel eastbound The travel time to the New York side is 15 minutes from New Jersey Turnpike Exit 14C and 15 minutes from New Jersey 139 at Tonnelle Circle.
-
As of 7:02am, there are Delays at the Lincoln Tunnel center tunnel eastbound New Jersey Side - Toll Plaza in Weehawken Twp. All lanes open The travel time is 20 minutes from New Jersey Turnpike Exit 16E to the New York side.
-
As of 7:01am, there are Delays on the Garden State Parkway northbound from North of Exit 148 - John F Kennedy Dr North to South of Exit 151 - Watchung St in Bloomfield. All lanes open 3 mile delay, due to volume.
-
As of 6:55am, there are Delays at the Lincoln Tunnel south tunnel eastbound New Jersey Side - Toll Plaza in Weehawken Twp. All lanes open The travel time is 20 minutes from New Jersey Turnpike Exit 16E to the New York side.
-
As of 6:54am, there are Delays on the George Washington Bridge lower level eastbound New Jersey Side in Fort Lee. All lanes open The travel time is 20 minutes on I-95 from I-80 to the Alexander Hamilton Bridge.
-
As of 6:54am, there are Delays on the George Washington Bridge upper level eastbound New Jersey Side in Fort Lee. All lanes open The travel time is 25 minutes on I-95 from I-80 to the Alexander Hamilton Bridge.
-
As of 6:49am, there are Delays on NJ 21 northbound from Wright St to Clay St/Mount Pleasant Av in Newark. All lanes open.
-
As of 6:47am, there are Delays on Pulaski Skyway northbound from Broadway to New Jersey Turnpike/NJ 139 Split in Jersey City. All lanes open.
-
As of 7:00am, there's Construction on NJ 120/Paterson Plank Road southbound between CR 503 and NJ 3 in East Rutherford. Right shoulder closed until 5:00 PM.
-
As of 7:00am, there's Construction on NJ 168 northbound CR 534/Church St in Gloucester Twp. Right shoulder closed until 4:00 PM.
-
As of 7:00am, there's Construction on US 1 in both directions from North of State St in Trenton to Carnegie Rd in Lawrence Twp. 1 right lane of 2 lanes, right shoulder closed until 3:00 PM.
-
As of 7:00am, there's Construction on NJ 3 westbound between Hackensack River Bridge in Secaucus and New Jersey Turnpike - Western Spur in East Rutherford. Right shoulder closed until 5:00 PM.
-
As of 7:00am, there's Construction on NJ 3 eastbound between New Jersey Turnpike - Western Spur in East Rutherford and Hackensack River Bridge in Secaucus. Right shoulder closed until 5:00 PM.
-
As of 7:00am, there's Construction on NJ 3 eastbound in the vicinity of Garden State Parkway in Clifton. Right shoulder closed until 5:00 PM.
-
As of 7:00am, there's Construction on NJ 3 westbound between East of Berrys Creek Bridge in East Rutherford and East of Ridge Rd in Rutherford. Right shoulder closed until 5:00 PM.
-
As of 7:00am, there's Construction on US 202 southbound in the vicinity of CR 613/River Av/Main St in Readington Twp. Right shoulder closed until 3:30 PM.
-
As of 7:00am, there's Construction on US 22 eastbound between West of Garden State Parkway and Vaux Hall Rd in Union Twp. Left shoulder closed until 3:00 PM.
-
As of 7:00am, there's Construction on I-287 southbound in the vicinity of Exit 59 - NJ 208 in Franklin Lakes. Right shoulder closed until 4:00 PM.
-
As of 7:00am, there's Construction on NJ 52 southbound 9th St/Palen St in Ocean City. 1 right lane of 2 lanes, right shoulder closed until 5:00 PM.
-
As of 7:00am, there's Construction on NJ 70 in both directions from East of NJ 41/CR 154 to New Jersey Turnpike in Cherry Hill Twp. 1 right lane of 2 lanes closed until 3:00 PM.
-
As of 7:00am, there's Construction on US 1 northbound between South of Olden Ave in Trenton and South of US 1 Business in Lawrence Twp. Right shoulder closed until 3:00 PM.
-
As of 7:00am, there's Construction on NJ 3 westbound in the vicinity of Berrys Creek Bridge in East Rutherford. Right shoulder closed until 2:00 PM.
-
As of 7:00am, there's Construction on I-676 northbound between South of Exit 3 - Morgan Blvd and South of Exit 5 - CR 537 in Camden. Right shoulder closed until 3:00 PM.
-
As of 7:00am, there's Construction on US 1&9 northbound in the vicinity of Ridgefield Circle in Palisades Park. Right shoulder closed until 3:00 PM.
-
As of 7:00am, there's Construction on US 1 southbound between North of Whitehead Rd in Lawrence Twp and State St in Trenton. Right shoulder closed until 3:00 PM.
-
As of 7:00am, there's Construction on US 40 in both directions from CR 608/Franklin Av in Pleasantville to CR 629/West End Av in Atlantic City. 1 right lane of 2 lanes, right shoulder closed until 3:00 PM.
-
As of 7:00am, there's Construction on US 130 in both directions in the vicinity of NJ 70 in Collingswood. 1 right lane of 2 lanes closed until 3:30 PM.
-
As of 7:00am, there's Construction on NJ 10 westbound I-287 in Hanover Twp. Right shoulder closed until 4:00 PM.
-
As of 7:00am, there's Construction on NJ 42 southbound between North of CR 651/Greentree Rd in Washington Twp and South of CR 689/Cross Keys Berlin Rd in Monroe Twp. Right shoulder closed until 4:00 PM.
-
As of 7:00am, there's Construction on NJ 18 southbound between I-287 in Piscataway Twp and North of CR 527/Old Bridge Tpke/Edgeboro Rd in East Brunswick Twp. Left shoulder closed until 3:00 PM.
-
As of 7:00am, there's Construction on NJ 18 southbound between South of CR 617/Rues Ln in East Brunswick Twp and South of Exit 25 - NJ 79 in Marlboro Twp. Left shoulder closed until 3:00 PM.
-
As of 6:30am, there's Construction on NJ 7 in both directions from CR 672/Mill St to Greylock Pkwy in Belleville Twp. 1 left lane of 4 lanes closed northbound; 1 right lane of 4 lanes closed southbound until 4:00 PM.
-
As of 6:00am, there's Construction on NJ 7 in both directions in the vicinity of Hancox Av in Belleville Twp. 1 left lane of 4 lanes closed northbound; 1 right lane of 4 lanes closed southbound until 4:00 PM.
-
As of 8:00pm, there's Construction on I-287 northbound between Exit 21 - I-78 in Bedminster Twp and Exit 35 - NJ 124 in Morristown. at least one lane closed until 6:00 AM.
-
As of 8:00pm, there's Construction on US 22 eastbound between East of N. Main St in Phillipsburg and East of NJ 57 in Lopatcong Twp. at least one lane closed and detoured until 6:00 AM.
-
As of 7:00am, there's Construction on NJ 70 eastbound from CR 673/Springdale Rd in Cherry Hill Twp to West of Cropwell Rd in Evesham Twp. 1 right lane of 2 lanes closed until 3:00 PM.
-
As of 6:00am, there's Construction on NJ 66 in both directions CR 16/Asbury Av in Neptune Twp. Right shoulder closed until 5:00 PM.
-
As of 11:00pm, there's Construction on NJ 23 northbound from CR 618/Kinnelon Rd/Keil Rd in Butler to North of Paterson Hamburg Tpke in West Milford Twp. All lanes open until 11:00 AM on July 25,2025.
-
As of 8:01pm, there's Construction on NJ 71 in both directions Shark River Bridge in Avon-By-The-Sea. All lanes closed and detoured until 11:45 PM on September 30,2025.
-
As of 4:02pm, there's Long term road construction on US 1&9/Tonnelle Avenue in both directions South of NJ 495/NJ 3 in North Bergen Twp. All lanes shift . Due to the Amtrak Gateway ? Hudson Tunnel Project.
-
As of 2:32pm, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 9 - Atlantic City International Airport -CR 563 in Egg Harbor Twp. 1 Left lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 6:17pm, there's Construction on the George Washington Bridge upper level westbound ramp from West 179th Street in New York. All lanes open until 11:59 PM on December 30,2025 Trucks wider than 10 ft or longer than 110 ft are prohibited.
-
As of 8:00pm, there's Construction on US 130 in both directions from North of NJ 33 in East Windsor Twp to CR 614/Dey Rd in South Brunswick Twp. 1 right lane of 2 lanes closed until 6:00 AM on August 02,2025.
-
As of 7:00am, there's Construction on NJ 47 in both directions from South of US 322/CR 641/High St in Glassboro to NJ 41/Hurfville Rd in Deptford Twp. 1 right lane of 2 lanes closed until 3:30 PM on July 25,2025.
-
As of 12:26pm, there's Construction on Inner Port Street in both directions between Corbin Street and Port Street in Newark. All lanes closed until September 2025.
-
As of 9:05am, there's Construction on Van Wyck Expressway northbound ramp to North Service Road in New York. All lanes closed until 11:59 PM on September 03,2025.
-
As of 8:59am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 38 - CR 536 in Winslow Twp. Left shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 6:55am, there's Roadwork on the Atlantic City Expressway eastbound in the vicinity of Pleasantville Toll Plaza in Pleasantville. Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 4:01am, there's Construction on NJ 70 in both directions between East of Cropwell Rd in Evesham Twp and NJ 38 in Pennsauken Twp. All lanes shift until 11:00 P.M.on November 30th, 2025.
-
As of 4:01am, there's Construction on US 130 in both directions from CR 551 in Brooklawn to North of NJ 45 in Westville. All lanes shift until 11:59 PM on July 31, 2025.
-
As of 4:00am, there's Construction on NJ 47 in both directions from CR 551/Broadway Av to US 130 in Westville. 1 Right lane closed until 11:59 PM on December 31,2025.
-
As of 4:00am, there's Construction on NJ 70 westbound CR 539/CR 530/Whiting New Egypt Rd in Manchester Twp. 1 Right lane closed until 5:00 AM on October 10,2025.
-
As of 7:47am, there's Construction on the Atlantic City Expressway eastbound from East of Exit 7 - Garden State Pkwy in Egg Harbor Twp to West of Exit 5 - US 9 in Pleasantville. 1 Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 7:43am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 14 - Leipzig Ave in Hamilton Twp. 1 Left lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 7:40am, there's Construction on the Atlantic City Expressway westbound in the vicinity of Exit 5 - US 9 in Pleasantville. 1 Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 7:30am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 41 - CR 689 - Berlin - Crosskeys Rd in Winslow Twp. Left shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 8:57am, there's Construction on Port Street eastbound ramp to Corbin Street in Newark. All lanes closed and detoured All EB Port St. access to SB Corbin St. to follow the posted Marlin St. detour until September 2025.
-
As of 6:08pm, there's Long term road construction on the New Jersey Turnpike - Eastern Spur southbound from South of Northern Mixing Bowl in Ridgefield to North of Interchange 17E - NJ 3/Lincoln Tunnel in Secaucus. 1 Right lane shift.
-
As of 10:18am, there's Construction on Corbin Street in both directions from Kellogg Street to Outer Port Street in Newark. 1 Right lane closed until September 2025.
-
As of 10:10am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Egg Harbor Toll Plaza in Hamilton Twp. Right shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 12:02pm, there's Construction on I-80 eastbound in the vicinity of Exit 56 - Squirrelwood Rd in Woodland Park. All lanes closed **Exit 56B Ramp only**, until 3:00 PM on November 18, 2025.
-
As of 12:37pm, there's Construction on the Atlantic City Expressway westbound in the vicinity of Exit 12A - US 40 - Wrangleboro Rd in Hamilton Twp. 1 Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 5:57am, there's Operational Activity on NJ 495 exclusive bus lane eastbound from East of New Jersey Turnpike in North Bergen Twp to West of Boulevard East in Weehawken Twp. All lanes open until 10:00 AM.
-
Northeast CorridorView Alerts
-
Travel Alerts
-
Service Advisories
Jul 21 2025 1:35PMNJ TRANSIT Offers Rail Service between Secaucus Junction & MetLife Stadium for Premier League Summer Series -
Station Advisories
Jul 24 2025 6:40AMUPDATE: Newark Penn Station: Track 1-PATH Passenger Elevator 37 Returned to Service - Effective ImmediatelyJul 24 2025 5:29AMRahway Station: Eastbound Elevator Temporarily Out of Service - Effective ImmediatelyJul 23 2025 10:10PMUPDATE: Trenton Transit Center: Tracks 1-2 Elevator No. 3 Returned to Service - Effective ImmediatelyJul 23 2025 1:17PMPenn Station New York: Temporary Entrance Closure – August 15 through August 18, 2025Jul 22 2025 7:05AMNew Brunswick Station: Eastbound Elevator Temporarily Out of Service - Effective ImmediatelyJul 2 2025 3:03PMMetropark Station: Eastbound Elevator Temporarily Out of Service - Effective ImmediatelyJul 2 2025 2:30PMMetropark Station: Sidewalk Construction – Effective ImmediatelyJun 25 2025 8:09AMElizabeth Station: Eastbound #1 Elevator Temporarily Out of Service - Effective ImmediatelyMay 13 2025 9:26AMMetropark Station: Construction Activity & Sidewalk Closure – Effective Monday, May 19, 2025Jun 24 2024 4:55PMMetropark Station: Construction Activity Resulting in Changed Traffic Patterns – Effective ImmediatelyOct 6 2023 7:26AMSecaucus Junction: Track 2 Partial Eastbound Platform Closure - Effective October 5, 2023Jun 9 2023 12:40PMNorth Elizabeth Station: Eastbound & Westbound Partial Platform Closure - Effective Immediately
-
-
North Jersey CoastView Alerts
-
Travel Alerts
-
Service Advisories
-
Station Advisories
Jul 24 2025 6:40AMUPDATE: Newark Penn Station: Track 1-PATH Passenger Elevator 37 Returned to Service - Effective ImmediatelyJul 24 2025 5:29AMRahway Station: Eastbound Elevator Temporarily Out of Service - Effective ImmediatelyJun 25 2025 8:09AMElizabeth Station: Eastbound #1 Elevator Temporarily Out of Service - Effective ImmediatelyMay 7 2025 10:56AMPerth Amboy Station: Station Enhancement Project Update - Effective Monday, May 12, 2025Oct 6 2023 7:26AMSecaucus Junction: Track 2 Partial Eastbound Platform Closure - Effective October 5, 2023
-
-
Raritan ValleyOn Time
-
Travel Alerts
-
Service Advisories
-
Station Advisories
Jul 24 2025 6:40AMUPDATE: Newark Penn Station: Track 1-PATH Passenger Elevator 37 Returned to Service - Effective ImmediatelyJul 21 2025 10:46AMRaritan Station: Long-Term ADA Ramp Repair – Effective Immediately
-
-
Morris & EssexView Alerts
-
Travel Alerts
-
Service Advisories
Jul 21 2025 1:35PMNJ TRANSIT Offers Rail Service between Secaucus Junction & MetLife Stadium for Premier League Summer Series -
Station Advisories
Jul 23 2025 1:57PMUPDATE: East Orange: Westbound Elevator Returned to Service - Effective ImmediatelyJul 23 2025 1:57PMUPDATE: East Orange Station: Eastbound Elevator Returned to Service - Effective ImmediatelyJun 19 2025 4:11PMHoboken Terminal: Construction Activity Resulting in Changed Traffic Patterns – Effective Monday, June 23, 2025Jun 18 2025 3:34PMMaplewood Station: Partial Parking Lot Closure – Monday, August 11, 2025
-
-
Main/Bergen/Port JervisOn Time
-
Travel Alerts
-
Service Advisories
-
Station Advisories
Jul 24 2025 6:43AMRidgewood Station: Center-Platform Elevator Temporarily Out of Service - Effective ImmediatelyJun 23 2025 6:56PMRamsey Route 17 Station: Westbound Elevator Temporarily Out of Service - Effective ImmediatelyMar 25 2024 11:16AMMahwah Station: Temporary Parking Updates - Effective Monday, April 1, 2024
-
-
Montclair-BoontonOn Time
-
Travel Alerts
-
Service Advisories
-
Station Advisories
-
-
Pascack ValleyOn Time
-
Travel Alerts
-
Service Advisories
-
Station Advisories
-
-
Atlantic CityOn Time
-
Travel Alerts
-
Service Advisories
-
Station Advisories
Oct 24 2023 8:58AMLindenwold Station: Waiting Room Closed - Effective Immediately
-
*NJ TRANSIT updates Travel Alerts 6 AM - 10 PM on weekdays and 10 AM - 7 PM on weekends.